Anonymised project example
Pool plant documentation overhaul
An anonymised example of turning pool-plant knowledge into controlled procedures, risk documentation and usable working records.
The challenge
Pool plant involves repeated operational tasks such as filter backwashing, chemical handling, equipment checks and contractor servicing. When that knowledge is mostly verbal, consistency disappears as staff change.
The Forge approach
- Create site-specific backwash SOPs
- Build task RAMS and risk assessments
- Organise COSHH information for treatment chemicals
- Introduce plant-room inspection sheets and defect tracking
- Link asset and service information to the plant
The operational benefit
The procedure, risks and evidence sit together. Staff can follow the actual operating sequence, record completion and raise defects within the same structure.
Privacy note: This example describes the structure and workflow used in this type of project. Client-identifying information is deliberately excluded.
