FC

Forge Compliance

Custom Compliance Software Interactive Example
CUSTOM COMPLIANCE SOFTWARE · EXAMPLE BUILD

Built around the way your operation works

This interactive demo shows one example of a Forge-built system. The real product is shaped around your sites, assets, workflows, responsibilities and budget, rather than forcing your business into a fixed off-the-shelf platform.

FICTIONAL DEMO DATA
This is an example, not a fixed package. Forge Compliance can build a lighter, simpler or more detailed system around the parts of your operation that actually need managing. You pay for the workflow you need, not a catalogue of features you will never use.
Estate Compliance97%
Open Issues17
Overdue PPM4
Committed Spend£62k

Quick actions

Common engineering tasks in this example build

End-to-end workflow

A typical pump failure
Fault detectedLive data / report
→
Issue raisedAsset identified
→
Quotes requestedApproved contractors
→
Approval & costWork instructed
DIGITAL ENGINEERING HUBS

Plant Rooms

Each plant room brings together its assets, valves, PPM, documents, faults and current work.

6 LOCATIONS

Demo estate

Fictional sample data
Healthy

Main Energy Centre

Heating, domestic hot water, pumps and heat exchangers.

28 assets64 valves12 PPM tasks
2 issues

Spa Plant Room

Pool heating, spa systems, water treatment and ventilation.

34 assets91 valves18 PPM tasks
Healthy

Guest House Plant

Local heating, DHW distribution and boosted cold water.

17 assets43 valves
Critical issue

North Wing Services

AHUs, heating distribution and pressure control.

22 assets31 valves
Healthy

Kitchen Services

Extract, hot water and cold-water services.

13 assets
Survey in progress

Leisure Pavilion

Local mechanical services and distribution.

9 assets
ASSET INTELLIGENCE

Asset Register

Technical information, maintenance history, documents and operational status against each asset.

123 ASSETS

Example assets

Click the pump to see lifecycle history
AssetPlant RoomSystemStatusNext PPM
P-MEC-01
Main Heating Pump
Main Energy CentreLTHWFault18 Aug
HX-MEC-01
Plate Heat Exchanger
Main Energy CentreHeatingRunning04 Oct
AHU-NW-03
Guest Corridor AHU
North Wing ServicesVentilationAttention29 Aug
SP-P-02
Spa Circulation Pump
Spa Plant RoomPool / SpaRunning12 Sep
ISOLATION MANAGEMENT

Valve Register

Identify service valves, isolation purpose, normal position and linked equipment.

229 VALVES

Valve records

Searchable by plant room, service or asset
TagPlant RoomServiceTypeNormalPurpose
MEC-V-014Main Energy CentreLTHW FlowIsolation ValveOpenHeating pump isolation
MEC-V-015Main Energy CentreLTHW ReturnIsolation ValveOpenHeating pump isolation
SPA-V-032Spa Plant RoomPool HeatingButterfly ValveOpenPool heat exchanger flow
SPA-V-041Spa Plant RoomHWSBall ValveOpenCylinder isolation
PLANNED MAINTENANCE

PPM Centre

See what is due, overdue, completed and assigned across the estate.

4 OVERDUE
Due This Week11
Overdue4
Completed86%
Contractor Tasks7
AssetTaskFrequencyDueAssignedStatus
P-MEC-02Pump service6 MonthlyTodayEngineeringDue
AHU-NW-03Filter & belt inspectionMonthly2 days agoAir Systems LtdOverdue
SP-P-02Seal and vibration checkQuarterly12 SepEngineeringScheduled
FAULT TO COMPLETION

Maintenance Issues

Public reporting, engineer assignment, status tracking, contractor escalation and permanent work history.

17 OPEN
New4
In Progress6
Awaiting Parts3
Completed Today5
UrgentIn Progress

MI-2026-0042

Main Heating Pump Fault
Main Energy Centre

Drive current abnormal. Pump stopped by controls.

HighNew

MI-2026-0041

Guest Bathroom Leak
North Wing Room 214

Reported by QR maintenance form.

NormalAssigned

MI-2026-0039

Kitchen Extract Noise
Kitchen Services

Assigned to Engineering.

PROCUREMENT & APPROVALS

Contractors & Quotations

Request quotes, compare repair and replacement options, approve spend and instruct the selected contractor.

£14,750 AWAITING APPROVAL

MI-2026-0042 · Main Heating Pump

3 contractor quotations
ContractorProposalCostLead TimeWarrantyStatus
FlowTech ServicesRepair pump & replace seal kit£1,8503 days12 monthsReceived
Premier Pumps LtdReplace pump assembly£3,6005 days24 monthsPreferred
Mechanical ResponseRepair and recommission£2,1001 day12 monthsReceived

Approval workflow

Demo example
Quote receivedSecure contractor portal
→
Engineering reviewRepair vs replace
→
ApprovalRecorded authorisation
→
Contractor instructedBooking requested
COMPLIANCE EVIDENCE

Operational Logs & Checks

QR-friendly forms for routine checks, with automatic timestamps and structured compliance history.

97% COMPLETE

Today's operational checks

Phone and tablet friendly
6 / 6

Pool Water Tests

Free chlorine, pH, temperature, corrective actions and operator record.

11 / 12

Temperature Checks

Outlet, storage and service temperature records.

4 / 4

Plant Checks

Routine engineering visual and operational inspections.

Demo principle: a QR code can open a single-purpose form without exposing the internal engineering system.
FUTURE FINANCIAL LAYER

Engineering Cost & Budget View

Turn approved maintenance work into committed spend, actual cost and asset lifecycle intelligence.

ROADMAP MODULE
Budget YTD£500k
Actual Spend£184k
Committed£62k
Remaining£254k

Where the money goes

Illustrative demo data
CategoryActualCommittedTrend
Reactive maintenance£68,400£21,800Rising
Planned maintenance£74,200£18,500On plan
Compliance£22,600£7,400On plan
Asset replacement£19,000£14,700Planned